The blue board is being installed on the ceiling of the train room
The blue-board has been installed on the walls of the train room
The plaster has been added to the walls
Trying a mixture of spackle, small black ballast, and black acrylic paint to make pavement.
Checking the fit of some newly constructed buildings in the downtown Lowell area